Aerial view of a lap swimming pool

Twelve steps to your first swim

A clear, transparent journey – from the first site visit to the day you dive in, and every year after.

12
Clear stages
45–75
Days for most homes*
1
Point of contact
0
Hidden costs

*Typical residential pool. Plunge pools are faster; resort & hotel pools usually take 3–5 months.

Step by step

Follow the water

Scroll down and watch the water flow through each stage of construction.

01
Day 1

Site Visit

Our engineer visits your property to study space, soil, levels, sun path, access for machinery and water/power availability.

02
1–2 days

Consultation

We discuss how you will use the pool, budget, style and must-have features – and give honest advice on what works best for your site.

03
5–10 days

Design & 3D

Layouts, sections and photo-real 3D renders. You see the pool, tiles, lighting and landscaping before anything is built.

04
2–3 days

Quotation

A detailed, itemised quotation – structure, equipment, finishes and timeline. Transparent, with no hidden costs.

05
3–7 days

Excavation

Marking, excavation to exact levels, soil disposal and base compaction – with safe shoring where required.

06
10–15 days

Structure

RCC or shotcrete shell with steel reinforcement, followed by multi-layer waterproofing and curing.

07
5–7 days

Plumbing & Filtration

Inlets, outlets, skimmers or overflow channels, balancing tank, pumps, filters and the plant room are installed and pressure-tested.

08
10–15 days

Tiling & Finishing

Mosaic, glass, stone or pebble finishes laid by master tilers, plus coping, steps and decking.

09
3–5 days

Lighting & Equipment

Underwater LEDs, heat pump, chlorinator, automation and water features are fitted and wired safely.

10
2–4 days

Water Filling & Testing

The pool is filled, circulation is run, water chemistry is balanced and every system is tested.

11
1 day

Handover

A walkthrough, operation training, documentation and warranty – then your first swim.

12
Ongoing

Maintenance

AMC plans with scheduled cleaning, water testing, equipment servicing and priority support.

Completed villa swimming pool at handover
At handover

Everything you need to enjoy it

  • As-built drawings & plumbing layout
  • Hands-on training for pump, filter & chemistry
  • Equipment manuals & manufacturer warranties
  • Structural & waterproofing warranty
  • First month of water-care support
Explore AMC plans
Step one is free

Book your site visit

We'll visit, listen and advise – no obligation.

Call Now